This hoop building was the gateway building for Frenchman Valley Coop. Their operations manager was not new to hoop buildings, having been a Macon customer prior to his position at Frenchman and he knew how well they performed. FVC had such a good experience with this project that they went ahead and put up two more within the next year. 1/7th Flush-floor aeration, 750 bu dump pit which allows them to dump both hoppers simultaneously. A 20,000 bph bucket elevator and 20,000 bph overhead fill conveyor with moveable plow system allows them to segment different proteins as the building fills. A 10,000 bph reclaim conveyor allows to empty over half of the building without using a piece of equipment. MaconMaximizer™, 3,000 bu loadout tank.