';
side-area-logo

Lansing Group

Grayridge, MO
Recommend
  • Facebook
  • Twitter
  • Google Plus
  • LinkedIN
Share
Tagged in
Description
  • Location:
    Grayridge, MO
  • Bushels:
    1,000,000
  • Cost per bushel:
    $1.65
Description
Macon worked with Lansing's project manager while he was at Gavilon, and when he took a new job with Lansing, he called on Macon to provide pricing on a hoop structure at the Grayridge, Mo facility. Lansing already had a big temp pile, and did not want the risk associated with putting in another one, but also did not have the budget for steel or concrete bins. A hoop building was the sweet spot that worked for everyone: merchandising, operations, and the board. A win/win/win solution that proved to be a big success!
Features
  • MaconMaximizer
Info