This 2014 project represents in many ways our standard project. While every site requires customization, many of our projects require only small tweaks from our base template. The facility did, however, desire the option of storing fertilizer, so we installed above-floor aeration and galvanized (corrosion-resistant) steel trusses. Features include: Reclaim tunnel, conveyor to load building, above floor aeration, 2500 psf soil.