A storm in the summer of 2011 ripped apart Landmark Co-Op’s elevator temporary storage. They contacted Macon at the end of July and asked if we could put up a hoop building in place of the damaged temp pile by Oct 10— in time for Wisconsin’s corn harvest. Macon took possession of the site in mid-August, and was able to finish the permanent hoop building by mid October, just in time for Landmark Coop to fill it full. Features include above floor aeration and a catwalk system for the fill conveyor, MaconMaximizer™.