Rather than put up another ground pile, Landus contacted Macon about a permanent solution. During discussions, Landus made the decision to eliminate one of their existing bunkers and include those bushels in the new building. The building can be filled with the new receiving system and leg, as well as transferred over from their existing dryer, giving them both speed and flexibility at harvest. The 20,000 bph reclaim transfers back to the house to assist with loading trains. 1/7th above ground aeration, 1,000 bu dump pit, 30,000 bph bucket elevator and 30,000 bph fill conveyor. 20,000 bph reclaim conveyor, reclaim transfer conveyor, scalper, temperature monitoring cables, MaconMaximizer™.