Yetter, Iowa – 2023
4,000,000
$2.73
180’ X 660’
Landus wanted to eliminate the risks and headaches of temporary storage and used Macon to replace a ground pile with a permanent building holding 4 million bushels. The Macon building at this facility features multiple reclaims, providing several options for moving grain to various locations at their facility. This is the fourth facility Macon has built for Landus.
© Copyright Macon Construction | Designed & Maintained by MCS Advertising