JR Isch, owner of Morrill elevator, was looking for cost effective, permanent storage. In the past he constructed steel bins, but was looking for better ROI. Macon constructed the hoop in 2012 and installed in-floor aeration. The condition of the grain has been excellent. Features include: In floor aeration, conveyor to load building, MaconMaximizer™ .